Math in the Workplace: Overview

print this page
Math in the Work Place

Math in the Workplace - Measurements

J D PROPERTY

Rental Property Management
Owner/Operator

 

Job Description: Owns, operates and manages rental properties. Oversees or does all maintenance and/or repairs on houses and property.
   


Problem:

You need to pour a new sidewalk that is 4' wide, 16' long, and 4" thick. Concrete costs $70.00/cubic yard.

diagram

1. How many cubic yards of concrete are required?

2. How much will the concrete cost?


solution

return to top J D PROPERTY


Solution:

cubic yardcubic foot

1 cubic yard = 27 cubic feet (ft3)
1 cubic foot = 3 ft2
1 cubic yard = 81 ft2
4 inch = 1/3 foot

4 ft  x  16 ft  x  1/3 ft  =  21.3 ft3

21.3 ft3 x 1 yd3

27 ft3
= 0.79 cubic yards needed

.79 cubic yards x $70.00 / cubic yard = $55.30